Basic Info
  • Factory Location: Zhejiang

    Main Sales Markets: North America,Central/South America,Western Europe,Eastern Europe,Australasia,Asia,Middle East,Africa

  • Packaging Information: plywood case

  • Delivery Lead Time: 1 week

    Sample Provided: no

    Payment Terms: T/T

    Frame The plates and compression plates are suspended from the upperload bar and are positioned by means of the lower guide rodswhich are fixed through the struts and are fitted with washers onthe tensioning bolts for disassembly of the equipment, frames andcolumns with adjustable supports. A device may include many heat exchangers, which are separated byconnection boards with interchangeable connectors.
Send your message to this supplier
  • From:
  • To:
    WENZHOU GAOBO PUMP CO.,LTD
  • Send a Copy to this Email
  • Message:
    Upload Images / Files
    - Supports jpg, jpeg, png,
     gif, pdf, doc, docx,
     xls, xlsx, txt, rar and zip
    - Max upload 3 files;
     Max  total size: 3MB
    (0/3)

    Enter between 20 to 4,000 characters.This is not what you are looking for ? Post a Sourcing Request Now

  • Verification:
PharmaSources Customer Service